The government has commenced the evacuation of accumulated waste at Agbogloshie in Accra as part of a major sanitation and environmental cleanup exercise aimed at improving public health, reducing flooding risks and restoring the area.
The waste is being transported to the Adepa Engineered Landfill Site as authorities intensify efforts to address Ghana’s longstanding waste management challenges.
The exercise forms part of a broader government programme to improve sanitation in Accra, strengthen waste disposal systems and reclaim areas affected by uncontrolled dumping.
According to the government, accumulated waste, plastics, electronic waste and other refuse at Agbogloshie have created serious environmental and public health concerns for surrounding communities. Waste entering the Odaw River and Korle Lagoon has also contributed to blocked drainage systems and increased flooding risks.

DRIP Equipment Deployed for Agbogloshie Cleanup
Heavy-duty equipment acquired under the District Road Improvement Programme (DRIP) is being deployed for the sanitation operation.
The equipment includes tipper trucks, excavators, bulldozers and wheel loaders, which will be used to remove, load and transport the accumulated waste.
The government says the deployment of DRIP machinery is intended to ensure that public equipment purchased with taxpayers’ money is put to practical use in addressing critical national challenges.
The operation is being coordinated by the Ministry of Local Government, Chieftaincy and Religious Affairs, with funding support from the Ministry of Finance and additional assistance from the District Assemblies Common Fund.
The Ghana Armed Forces, particularly the 48 Engineer Regiment, are also providing engineering and operational support for the exercise.
Private Contractors Join Agbogloshie Sanitation Exercise
Private road contractors have also been mobilised to support the cleanup with additional equipment, including dump trucks.
The government is also engaging bulk oil distribution companies and oil marketing companies to provide fuel and other essential supplies needed to keep the operation running.
Authorities have stressed the need for proper management of fuel, equipment, funds and personnel to ensure accountability and measurable results throughout the sanitation exercise.

Agbogloshie to Make Way for Urban Renewal Project
Beyond the removal of waste, the government says the exercise is intended to pave the way for the proposed Agbogloshie Urban Land Renewal Project.
After the site is cleared and reclaimed, plans outlined in the speech indicate that the area will be developed into an Industrial Park, including a proposed major textile factory expected to create employment opportunities for young people.
The cleanup is also intended to end open dumping and burning, which authorities say have contributed to environmental degradation and public health concerns.
The evacuated waste will be transported to the Adepa Engineered Landfill for controlled disposal, compaction and covering in accordance with environmental safeguards.
Government Targets 90 Days to Clear Agbogloshie
The government estimates that approximately 1 million tonnes of waste could be removed from the area.
According to the speech, an AI-assisted drone assessment estimated the volume of waste, while engineers believe the clearance exercise could be completed within 90 days, subject to the operation progressing as planned.
Authorities have also proposed conducting major waste haulage activities at night under the 24-Hour Economy Initiative, while smaller-scale waste removal would continue during the day.

Measures to Prevent Illegal Dumping After Cleanup
The government says measures will be introduced to ensure that Agbogloshie does not become an illegal dumping site again after the cleanup.
The Ghana Armed Forces are expected to assist in protecting the reclaimed land, while the Accra Metropolitan Assembly and Ablekuma Central Municipal Assembly are expected to enforce municipal by-laws and work with traditional and community leaders to prevent renewed dumping.
Authorities have also emphasised the need for reliable and affordable waste collection services for residents and businesses.
Nationwide Waste Management Programme
The Agbogloshie cleanup forms part of a wider national strategy to improve waste management in Ghana.
The proposed programme includes providing households with waste bins, constructing additional waste transfer stations and using DRIP equipment to support the development of landfill facilities.
Government also plans to increase the number of recycling plants, expand landfill capacity in the Greater Kumasi Area and develop engineered landfill facilities in all 16 regional capitals.
The broader strategy also places emphasis on waste separation, recycling and material recovery to reduce the amount of refuse sent to final disposal sites while creating opportunities for businesses and employment.
Following the Agbogloshie operation, the DRIP equipment deployed to the area is expected to be sent to district and municipal assemblies to assist with the clearing of other refuse dumps across Ghana.

Government Appeals for Public Cooperation
Authorities have appealed to residents, traders, motorists and transport operators to cooperate with personnel managing the cleanup exercise.
The movement of heavy-duty vehicles and waste removal activities are expected to affect traffic and daily activities in parts of Accra. Officials have therefore urged the public to exercise patience and follow safety instructions during the operation.
The government has also stressed that long-term improvements in Ghana’s sanitation system will require cooperation from citizens, businesses, local authorities and traditional leaders.
The broader objective is to improve waste disposal, protect rivers and lagoons, keep public spaces clean and build a more effective waste management system across Ghana.
The government has officially declared the Agbogloshie waste evacuation to the Adepa Engineered Landfill Site underway.


Source: newsthemegh.com